Client & Case Study

Hong Kong Baptist University

Client case study description

Hong Kong Baptist University’s campus expansion needed a network redesign to meet ultra-high SLA requirements. The university selected A10 Networks Thunder ADC line of Application Delivery Controllers to ensure equal distribution of applications traffic between data centers and servers, enabling easy horizontal scaling of infrastructure, optimal performance and high application availability.

Freestyle Tags