Client & Case Study

The Hirslanden Group

Client case study description

Minimum response times and maximum availability of IT applications are a necessity in healthcare. Hirslanden Private Hospital Group has therefore opted for two geographically separate data centers with an integrated load-balance cluster. This ensures dynamic load balancing and delay-free work. The Hirslanden Group chose A10 Thunder ADC to distribute requests dynamically to the appropriate server, and thanks to the automatic ‘fail over,’ it ensures the seamless availability of the KIS application in the event of a data center failure.